EasyManua.ls Logo

Coca-Cola Post Mix System - Restart Preparation and Initial Steps

Coca-Cola Post Mix System
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
• Coca-Cola Work Out Kit
• Small brush
• Paper towels
• Pair of Scissors
• Clean cloths
• CO₂ bottle
• Measuring Jug and Bucket
• New Bag in Box (if required)
• Personal Protective
Equipment
Items you will need to complete
the restart process.
Check and turn on
the CO₂ supply
Turn on the mains
water supply
Turn on the CO₂
Check gauge goes to approx. 600psi
Turn on isolator valves (straight down)
Only turn on valves that have a grey pipe
connected to them
Locate the mains water supply valve
Turn it to the on position
1
2
3