EasyManua.ls Logo

Coffee Queen TOWER MARIN - General Tower 3 en; Function Description, General; Start Up, General

Coffee Queen TOWER MARIN
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.
2. General TOWER marin
TOWER 2x5-Litre
We congratulate to your choice of Tower
coffee machine.
The brewer is equiped with full and half brew
function.and a separate outlet for hot water.
Tower is delivered with a brew unit, 2 serving
stations and filter holder.
Crem International AB is certified
ISO 9001 and 14001 and therefore
a minimal stress of the enviroment.
3. Function description - General
TOWER
bulk brewer
Coffee brewer with automatic water supply.
It is also equipped with a separate outlet for hot water.
Brewing takes place in removable serving stations.
Brewing is carried out in paper filters. (filter 523).
Brew time for 5 ltrs. approx. 7min.
4. Start
up - General
Turn on the main switch, push on/off.
The machine is now filling and will start heating water.
Machine is ready for brewing when ”Display” lights up
and the correct temperature has been reached. (A)
(approx 17 minutes).

Related product manuals