EasyManua.ls Logo

Coffee Queen TOWER - Function Description, General; General; Start Up, General

Coffee Queen TOWER
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.
2. General. Tower wall mounting
Coffee Queen TOWER wall mounting
We congratulate to your choice of coffee machine.
The brewer is equiped with full and half brew function.and a separate outlet for hot water.
Tower is delivered with a brew unit, 2 serving stationsand filter holders. serving trolley,
wall bracket with screws ( 6 adjustable feets).
Coffee Queen AB is certified ISO 9001 and 14001
and therefore a minimal stress of the enviroment.
3. Function description - General
TOWER bulk brewer
Coffee brewer with automatic water supply.
It is also equipped with a separate outlet for hot water.
Brewing takes place in removable serving stations.
Brewing is carried out in paper filters. (filter 523).
Brew time for 5 ltrs. approx. 7min.
4. Start up - General
Turn on the main switch (A).
The machine will now fill and start heating water.
Machine is ready for brewing when display lights up
and the correct temperature has been reached. (A)

Other manuals for Coffee Queen TOWER

Related product manuals