9.
7. Installation and start. Tower for wall-mounting.
7.5. Connect the brewer unit to a coldwater feed -1/2"R with connection tube supplied.
NOTE! The new hose set supplied with the appliance shall be used and that old hose
sets shall not be reused. Connection to a closable valve is recommended.
Min. water pressure; 2bar (200kPa). Max. waterpressure; 8bar (800kPa).
Water supply to the machine is the customer’s responsibility according to
instruction and advice from the supplier.
In areas with high level lime problem, a descaling filter should be mounted.
7.6. Electrical connection;
The brewer is not reconnectable and may only be installed to the electric supply network
with a voltage that is stated on the brewer and shall be carried out by an authorized
electrician.
Recommended: Install a line circuit breaker and a earth fault breaker to the machine.
CAUTION! Connection to a separate 3 phase only
- Brewer should be connected to 380 V with Zero and earth.
- Use 16 Amp fuses.
IMPORTANT!
Electrical installations must be done of an certificated electrician.
380 V 3 - phase + Zero + ground 9000W