EasyManua.ls Logo

Comfee CVP30W4AST - Page 9

Comfee CVP30W4AST
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
WALL DRILLING AND BRACKET FIXING
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
A horizontal line C at a X
A horizontal line B at
A horizontal line A at a
B.
to the vertical reference line.
Repeat this operation on the other side and on the vertical reference line , checking that
the three marks are leveled.
to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
Mark a point (1) on the horizontal line B,
Mark a point (2) on the horizontal line C,
Mark a point (3) on the horizontal line A,
to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
above the cooker top.
inch above the horizontal line
C
B
(1)
A
(3)
Vertical reference line
X
7.48"
below the horizontal line
1.57"
6.69"
36.61"
-
40.55"
7.48"
B.
3.15''
1.57"
3.15"
3.15"
6.69"
unitinch
36.61" - 40.55"
1.57''
6.69''
Chimney
X
/
15.75"+
11.81''
15.35''
-
24.41''
15.75"
Fix the brackets :
3/8''
drill bit.
Drill holes at the marked points with a
Insert the Wall Plugs 11 into the holes.
Fix the hood fixing bracket 20 with 3 screws 10 (0.2'' x 1.97'') at the horizontal line B.
Fix a Chimney fixing bracket 21 with 2 screws 10 (0.2'' x 1.97'') at the horizontal line C.
7

Related product manuals