Do you have a question about the Contrel ELR-3A Series and is the answer not in the manual?
Device with 2 independent programmable relays, one main and one prealarm, featuring a potential-free input for external ON/OFF.
Check unit specifications against order and for transport damage. Information available on CONTREL website.
Verify unit specifications match the order and check for any damage sustained during transport.
Staff must follow common safety measures. Ensure the equipment is not connected to the power supply when handling.
Follow manual instructions for correct operation and safety. Ensure full installation before powering on the equipment.
Unit protections may be ineffective if used for unintended purposes. Disconnect from power if malfunctioning or damaged.
Route all live conductors through the CBT. Ensure connections are within the electrical board and handle with care.
Details on relay type, power supply voltage, operating temperature, humidity, altitude, IP protection, and output contacts.
Overview of equipment status indication via display and LEDs, and controls for setup, test, and reset functions.
Main trip relay status changes color (green/red). Prealarm LED activates when leakage exceeds preset threshold.
Equipment status returns to initial after a manual RESET or power disconnection (for trip) or manual RESET (for prealarm).
Setting trip delay (ta), sensitivity (la), and safety type (std/+) for the main relay via buttons and display.
Access setting menu via PROG button. Use buttons to navigate submenus and change preset values like frequency and current limits.
Graph showing DC load breaking capacity and electrical useful life for AC loads based on current.
Device with 2 independent programmable relays, one main and one prealarm, featuring a potential-free input for external ON/OFF.
Check unit specifications against order and for transport damage. Information available on CONTREL website.
Verify unit specifications match the order and check for any damage sustained during transport.
Staff must follow common safety measures. Ensure the equipment is not connected to the power supply when handling.
Follow manual instructions for correct operation and safety. Ensure full installation before powering on the equipment.
Unit protections may be ineffective if used for unintended purposes. Disconnect from power if malfunctioning or damaged.
Route all live conductors through the CBT. Ensure connections are within the electrical board and handle with care.
Details on relay type, power supply voltage, operating temperature, humidity, altitude, IP protection, and output contacts.
Overview of equipment status indication via display and LEDs, and controls for setup, test, and reset functions.
Main trip relay status changes color (green/red). Prealarm LED activates when leakage exceeds preset threshold.
Equipment status returns to initial after a manual RESET or power disconnection (for trip) or manual RESET (for prealarm).
Setting trip delay (ta), sensitivity (la), and safety type (std/+) for the main relay via buttons and display.
Access setting menu via PROG button. Use buttons to navigate submenus and change preset values like frequency and current limits.
Graph showing DC load breaking capacity and electrical useful life for AC loads based on current.
| Series | ELR-3A |
|---|---|
| Frequency | 50/60 Hz |
| Mounting | DIN Rail |
| Sensitivity (IΔn) | 30mA |
| Insulation Resistance | 100MΩ |
| Vibration Resistance | 10-55Hz |
| Weight | 150g |
Loading...