1. GENERAL
The ber zone box (FZB) may be equipped with EDGE™ or EDGE8™ module trays. Installation of
modules is the same for either tray.
2. TOOLS AND MATERIALS
• Panel-lifter (suction cup for laminate panels or hook-and-loop for carpeted panels) for
accessing the raised oor.
• Screwdriver and other standard tools (pliers, etc.)
• Mounting hardware is not provided. The type of hardware used depends on the mounting
location; wall anchors may be required for adequate support on sheetrock walls.
3. GAINING ACCESS TO THE FIBER ZONE BOX (FZB)
3.1. To Open the Door
Step 1: Unlock the door, then remove the key.
Step 2: Pull the latch handle up and turn it one-quarter turn as shown in Figure 2.
related literature |Search www.corning.com/opcomm. Click on “Resources.”
003-794-AEN
EDGE Solution
003-888-AEN EDGE Solution with 1U/2U/4U Fixed Trays
003-276-AEN EDGE Secure Solutions FTTD Module
003-991-AEN EDGE Port Replication Housing
003-892-AEN
EDGE and EDGE8® Solution Single Module Housing
003-1049-AEN EDGE Solution Single Module Housing for Splicing
000-274-AEN EDGE Splice Cassette/EDGE Field-Terminated Cassette
003-885-AEN EDGE Solution Modules in an Enhanced Management Frame
006-407-QSG-AEN Field Tool for MTP® PRO Connectors Quick Start Guide
Figure 1

Other manuals for CORNING EDGE

Question and Answer IconNeed help?

Do you have a question about the CORNING EDGE and is the answer not in the manual?

CORNING EDGE Specifications

General IconGeneral
Product TypeRack
Housing TypeEnclosed
MaterialSteel
ColorBlack
ApplicationData Center
MountingFloor Standing
Number of Rack Units42U
Number of Shelves4
Adjustable ShelvesYes
Wheel TypeCaster Wheels

Summary

GENERAL

TOOLS AND MATERIALS

GAINING ACCESS TO THE FIBER ZONE BOX (FZB)

To Open the Door

Steps to unlock and open the FZB door using the latch handle.

To Access Interior of FZB for Cable and Module Installation

Instructions for removing plates and latches to access the FZB interior for work.

To Remove the Door

Procedure for safely detaching the FZB door from its hinges.

MOUNTING THE CABINET

To a Wall

Guide for securely mounting the FZB cabinet onto a vertical wall surface.

Underneath a Raised Floor

Methods for installing the FZB beneath a raised floor system.

In a Suspended Ceiling

Steps for installing the FZB within a suspended ceiling.

INSTALLING MODULES

INSTALLATION OPTIONS

CONNECTOR CARE AND CLEANING — POST INITIAL MATING