p/n 003-825-AEN, Issue 7
STANDARD RECOMMENDED PROCEDURE 003-825-AEN | ISSUE 7 | NOVEMBER 2020 | PAGE 1 OF 11
EDGE™ and EDGE8®Fiber
Zone Boxes
1. GENERAL
The ber zone box (FZB) may be equipped with EDGE™ or EDGE8™ module trays. Installation of
modules is the same for either tray.
2. TOOLS AND MATERIALS
• Panel-lifter (suction cup for laminate panels or hook-and-loop for carpeted panels) for
accessing the raised oor.
• Screwdriver and other standard tools (pliers, etc.)
• Mounting hardware is not provided. The type of hardware used depends on the mounting
location; wall anchors may be required for adequate support on sheetrock walls.
3. GAINING ACCESS TO THE FIBER ZONE BOX (FZB)
3.1. To Open the Door
Step 1: Unlock the door, then remove the key.
Step 2: Pull the latch handle up and turn it one-quarter turn as shown in Figure 2.
related literature |Search www.corning.com/opcomm. Click on “Resources.”
003-794-AEN
EDGE™ Solution
003-888-AEN EDGE Solution with 1U/2U/4U Fixed Trays
003-276-AEN EDGE Secure Solutions FTTD Module
003-991-AEN EDGE Port Replication Housing
003-892-AEN
EDGE and EDGE8® Solution Single Module Housing
003-1049-AEN EDGE Solution Single Module Housing for Splicing
000-274-AEN EDGE Splice Cassette/EDGE Field-Terminated Cassette
003-885-AEN EDGE Solution Modules in an Enhanced Management Frame
006-407-QSG-AEN Field Tool for MTP® PRO Connectors Quick Start Guide
Figure 1