Note: It is vital that the fort
be level after this
phase!
N
o
t
e
!
I
m
p
o
r
t
a
n
t
MAKE SURE FRAME IS
SQUARE BEFORE
PROCEEDING TO
NEXT PHASE!
(5) WD24 Playhouse Wall Slat-A 1× 4×27 9/16
ITEMS NEEDED
(1) WF22 Playhouse Arched Guardrail-A 1×6×54
(1) WD31 Tower Surrounded Board-C 1× 4×6 27/32
(1) WD23 Tower Surrounded Board 1×4×24 3/8
WD31
WD23
6STEP :
WF22
b2
e6
(2)
d1
(2)
b2
k2
a3
(4)
(6)
(20)
HARDWARE NEEDED
(2)
k1
k2
b2
b2
k2
e6
k2
d1
k1
b2
e6
* Insert all nut barrels "d1" into the uprights respectfully.
* Attach WD23 and WD31 to WQ02a & b with wood screw "b2".
* Attach WF22 to WQ02a & b (See diagram below).
* From the inside deck, attach four WD24 to the right of the arch with wood screws "a3".
TOWER ASSEMBLY
* From the inside deck, attach one WD24 to the left of the arch with wood screws "a3".
Inside view
k2
N
o
t
e
!
I
m
p
o
r
t
a
n
t
FRONT
Keep flush to the bottom
Note spacing 1 3/4"
Front wall assembly
WD24
a3
1 3/4"
a3
Note spacing
22