N
o
t
e
!
I
m
p
o
r
t
a
n
t
MAKE SURE FRAME IS
SQUARE BEFORE
PROCEEDING TO
NEXT PHASE!
WF27
a3
WD09
WC17a
WD24
WC17b
WF29
13 STEP
:
(1) WF27 Gazebo Guardrail 1× 6×23 29/32
ITEMS NEEDED
(1) WF29 Swing Attaced Board 5/4×6×31
e3
b2
k2
k2
k1
d1
b2
b2
a3
(1) WD09 First Floor Guardrail 1×4×52 13/16
(3) WD24 Playhouse Wall Slat-A 1× 4×27 9/16
(1) WC17a Wall Slat-A 1× 3×37
(7) WC17b Wall Slat-B 1× 4×37
(11)
HARDWARE NEEDED
e3
d1
(2)
b2
k2
(9)
(2)
k1
(2)
(44)
a3
Insert(4)T-nuts into backside
of "WF29" for use in Step22
h
(4)
h
2 3/8"
TOWER ASSEMBLY
Note: It is vital that the fort
be level after this
phase!
* Insert four T-nuts "h" into the backside of WF29 for use in Step22.
* Attach WF29 with bolts "e5" and wood screws "b2".
* Attach WF27 and WD09 with wood screws "b2".
* From the inside of the playhouse, attach seven WC17b and one WC17a with wood screws "a3"
* From the inside of the playhouse, attach three WD24 with wood screws "a3".
N
o
t
e
!
I
m
p
o
r
t
a
n
t
This is a slightly smaller board
N
o
t
e
!
I
m
p
o
r
t
a
n
t
N
o
t
e
!
I
m
p
o
r
t
a
n
t
Keep flush to the bottom
k2
Right wall assembly
TOWER ASSEMBLY
29
k2