MODEL PS18SPH
19861-300 Rev A (07-20)
© Copyright 2013, Creative Playthings
Page 13
ASSEMBLY INSTRUCTIONS
STEP 14 — Assemble Roof Panels:
Assembly of the Roof Panels will be easiest on a work table
or other at surface.
Lay Out Roof Rafters:
Butt the square-cut end of two Rafters (U) against a straight
at surface. Align the Rafters so they are parallel and the
ends aligned and square. The distance between the Rafters
should be 30". Measure from corner to corner both ways.
When the two diagonal measurements are the same, the
rafters are square.
30"
30"
U
U
3" Lag
Screw
3" Lag
Screw
Q
Y
Y
Z
#10 x 1-5/8"
Screws
< 1/8" gap between
1st four boards
Evenly space the
back eight boards
STEP 12 — Stringer:
Fasten the Stringer (Q) to the Platform Front and Platform
Back using two 1/4 x 3" Lag Screws and Flat Washers as
shown.
STEP 13 — Deck Boards:
Locate the nine Deck Boards (Y) and three Narrow Deck
Boards (Z). Lay them across the platform supports and
stringer in the arrangement shown at right. Align the ends of
the Deck Boards. The Narrow Deck Boards t between the
uprights.
Starting at the front of the gym fasten each board using #10
x 1-5/8" Screws. For the rst four boards, leave a gap of 1/8"
or less to limit the possibility of clothing being snagged when
children use the slide. Space the rest of the boards evenly.
Note that the Narrow Deck Board between the Midposts
need not align exactly with the Midposts.