EasyManua.ls Logo

Crosswater Optix 10 - User Manual

Default Icon
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
PH 68a72
PH68PH!72
INSTALLATION INSTRUCTIONS
Important Pre-Installation
Ensure the bath rim is as flat as possible,
this will assist in a smooth and water tight
moving door operation.
IMPORTANT
Optix 10 Single Inline Panel Screen
Optix 10 Single Inline Panel Screen
LH RH
OXBDFC0900R
OXBDSC0900R
OXBDVC0900R
40Kgs
40Kgs
OXBDFC0900L
OXBDSC0900L
OXBDVC0900L
40Kgs
40Kgs
40Kgs 40Kgs
Question and Answer IconNeed help?

Do you have a question about the Crosswater Optix 10 and is the answer not in the manual?

Summary

Product Information and Safety

Pre-Installation Checks

Ensure bath rim is flat for smooth, watertight door operation.

Installation Preparation and Safety

Important Pre-Installation Guidance

Read instructions, check pack, report faults, ensure correct sizing.

Installation Advice and Safety Precautions

Fix to solid walls, use 2 people, handle glass carefully.

Care and Cleaning Instructions

Clean with mild soapy water and a soft cloth only.

Left and Right Hand Versions

Identifies left and right hand versions of the screen for installation.

Step-by-Step Installation Guide

Required Tools (Not Supplied)

Lists tools needed for installation, which are not included.

Step 1: Wall Profile Installation

Attaching the main wall profile component to the wall.

Step 2: Drilling and Securing

Drilling holes and fixing the wall profile with screws.

Step 3: Wall Profile Reinforcement

Further securing the wall profile for stability.

Step 4: Seal Fitting

Attaching vertical and other seals to the glass and profiles.

Step 5: Bath Rim Sealing

Applying sealant to the bath rim for watertightness.

Step 6: Bracing Bar Attachment

Installing the bracing bar for structural support.

Step 7: Final Sealing and Drilling

Completing final drilling and sealing tasks.

Step 8: Moving Panel Fitting

Attaching the moving panel and its seals.

Step 9: Panel Securing and Torque

Fixing panels and ensuring correct screw torque.

Step 10: Top Profile and Final Check

Installing the top profile and performing final checks.

Step 11: Sealant Curing

Allowing sealant to cure for 24 hours before use.

Crosswater Optix 10 Specifications

General IconGeneral
BrandCrosswater
ModelOptix 10
CategoryIndoor Furnishing
LanguageEnglish

Related product manuals