EasyManua.ls Logo

Crown SX-3 - Page 6

Crown SX-3
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION AND OPERATION MANUAL, ELECTRIC COUNTER CONVECTION
STEAMER, MODELS: SX-3, SX-5
PART NUMBER 10080R5 6 2007-01-02
LEVELLING
Using a spirit level or pan of water in the bottom of the steamer, adjust the levelling feet or the
feet on the adjustable legs to level the steamer front-to-back and side-to-side. After the drain is
connected, check for level by pouring water onto the floor of the compartment. All water should
drain through the opening at the back of the compartment cavity.
ANCHORING STEAMER (Without Legs)
1. Place steamer in the desired location on the levelled counter top and mark four corners.
Remove the steamer and drill ½" holes as indicated in Figure 1.
2. Apply a bead of RTV or other equivalent sealant around bottom perimeter edge of the
steamer. If anchoring the steamer, this bottom seal is necessary to meet NSF
requirements.
3. Set steamer on counter and bolt down securely with 3/8 - 16 bolts (not supplied).
STACKING KIT
Follow instructions in the stacking kit when installing stacked convection steamers.
FIGURE 1