1.
48"
Bucket
2.
Pin
3.
3/8" Locknut
4. 3/8 x
1"
Capscrew
CD4196
Figure 25. Attaching 48" Bucket
Assembling the Valve and Hoses
(Figure 26)
Fasten valve mounting bracket
to
the holes in the rear
of the right loader upright using 3/8 x 1" capscrews,
lockwashers and nuts. This bracket should be
mounted so the valve will
be
between the loader
upright and tractor.
Insert
90°
adjustable elbow (1) into power beyond
port
of
valve. Connect the longer hydraulic hoses
to
all three port fittings and tighten the connections.
Remove
two
1 /4" hex nuts and lockwashers from the
back side
of
the valve cover. Attach the valve and
cover
to
the valve mounting bracket using extreme
1. Adjustable elbow
A - Bucket Dump
B - Bucket Rollback
C-Boom
Down
0-BoomUp
~
~
care
to
avoid dislodging the capscrews. (Use the
middle
of
the three holes available at the lower
comer
of the valve bracket.) Replace
the
hex nuts and
lockwashers and tighten firmly.
NOTE: If capscrews become dislodged
or
cannot be
tightened, it will be necessary
to
remove
the
end
cover
to
gain access.
Next, connect
the
90° end
of
the shorter hoses
to
the
workports
of
the valve. Install orifice
in
port "B" with
the feet out before connecting hose. Connect the
opposite end of each hose
to
the
appropriate feedline
on the loader boom. (Check the diagram carefully to
determine appropriate connection.)
lighten
hose
connections before proceeding:
ORIFICE-
PORT"B"
Figure 26. Assembling Valves and Hoses - Model 416
F-8297 (1-94)
11