EasyManua.ls Logo

curt 13118 - Installation Walkthrough Steps 3-5; Bolt Insertion and Hitch Positioning; Final Torque and Reassembly

curt 13118
5 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION WALKTHROUGH:
For more information log onto www.curtmfg.com, & for helpful towing tips log onto www.hitchinfo.com
4. Raise hitch into position and pull the fishwires so the
bolts are in their final position. Remove the fishwires
carefully and loosely install the supplied 5/8" hex
flange nuts. Reinstall the grounding cable with the
supplied 8mm fastener if removed in step 1.
5. Torque all 5/8" fasteners to 210 lb-ft.
Raise spare tire back into position.
3. Fishwire (2) 5/8" carriage bolts and spacers
through either an access hole or the end of the
frame rail. Leave them in the frame with the
fishwires attached. Repeat for other side.

Related product manuals