EasyManua.ls Logo

CyClone SCB300 - Island Installation - Tools and Materials Required; Island Installation - Parts Supplied

CyClone SCB300
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9Cyclone Canopy Installation - English
3 × Mounting Brackets
(Upper and Expandable Side)
HARDWARE PACKAGE
4 × Mounting Screws
4 × Washers
6 × Adapter Screws
20 × Mounting Bracket Screws
SI520 ONLY
2 × Bottom Chimney Screws
ISLAND INSTALLATION - PARTS SUPPLIED
1 × Hood
1 × Chimney Flues
(Top and Bottom)
1 × Round Adapter
(May be Pre-Installed)
ISLAND INSTALLATION - TOOLS AND MATERIALS REQUIRED
Electrical drill or ratchet driver
½” drill bit for drilling pilot holes
1 ¼” drill bit for drilling electrical wiring access
hole (if applicable)
Phillips screwdriver #2 or driver bit
Wire stripper or cutter
Tape measure
Aluminum foil tape and/or duct tape
Electrical supplies for wiring (i.e. marrets,
electrical tape)
Hammer
Jigsaw or saber saw
Drywall stud (if applicable)
Step ladder
Stud nder
Level
PRE-INSTALLED
2 or 4 × LED Lights
(1.5W per bulb)
*Bulb & socket may change.
1 × Oil Cup
1 × Plastic Adapter Seal

Related product manuals