EasyManua.ls Logo

Daewoo DE12 - Page 120

Daewoo DE12
165 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection of pre-lift
a. If the nozzle tester handle is released
with the needle valve engaged in a full
lift condition, the tester pressure drops,
being accompanied by decrease in the
needle valve lift value(indicated value
on the dial gauge). (Figures 4-43 and
4-44)
b. Take the indicated value on the dial
gauge at the point of time when the
secondary spring completes its opera-
tion and the needle valve puts an end
to descent(the position of needle valve
lift value "
l" as shown in the figures 4-
44 and 4-45) and check that the value
is within the specified limit.
- 117 -
200
100 400
500
0
300
kgf / cm
2
EQM4049I
<Figure 4-43> Drop of tester pressure
L
0
EQM4050I
<Figure 4-44> Descent of needle valve
Amount of lift
Tester pressure
l
EQM4051I
<Figure 4-45> Position of "l" of needle valve
l
M

Related product manuals