EasyManua.ls Logo

Daewoo DE12 - Page 128

Daewoo DE12
165 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5) Wiring harness
(1) The wiring harness layout is as shown below.
- 125 -
EA2M4012
(2) Position each switch on the check-
er(407980-2090) as shown at left.
COUTION : Leave the power
switch OFF to pre-
vent the pre-stroke
actuator from over-
heating.
EA2M4013
(3) Reinstall the measuring device
(105782 -4371) on the No.1 cylinder
as described in ‘Injection timing
adjustment’.
(4) Adjust the pump test stand’s fuel oil
supply pressure to as low a pressure
as possible (eg. 20 kPa(0.2 kgf/cm
2
)).
(5) Turn the pump test stand’s flywheel
and adjust the No.1 cylinder’s lift to
4
L
0.05mm (refer to pages 50 and
51).
EA2M4014

Related product manuals