EasyManuals Logo

Daewoo GC30S-2 User Manual

Daewoo GC30S-2
26 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
End Cap
1. Install new O-ring (12) on the sleeve(11).
2. Insert sleeve (11) into retainer (10).
3. Assemble dust cover (9) and retainer and sleeve
with attaching screws (8).
4. Tighten the screws (8) to a torque of 11 - 15 N
¥
m
(8 - 11 lb
¥
ft).
Flow Control Checks
1. Insert small check spring (6) into larger spring.
2. Install flow control sensor ball(s)(7) and springs in
proper bores of inlet and mid-body sections.
Attaching Parts
CAUTION : Make sure all mating surfaces of valve
bodies are clean and free of burrs.
1. Install seals (4), O-ring (5) and the retainer (3) in
the grooves in the body of each inlet and mid-body
section.
2. Carefully place the sections together in the same
order in which they were removed.
3. Coat the stud threads with Loctite or a similar
sealant and install the studs.
4. Tighten the nuts to 38 - 44 N
¥
m (28 - 32 lb
¥
ft)
torque.
29 of 29New Hydraulic Systems Disassembly and Assembly

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daewoo GC30S-2 and is the answer not in the manual?

Daewoo GC30S-2 Specifications

General IconGeneral
BrandDaewoo
ModelGC30S-2
CategoryForklifts
LanguageEnglish

Related product manuals