3
MECHANICAL GEARBOX CONTROL
Removal and installation CF65/75/85 series
3-10
Installing the gear lever ball
1. Apply a degreasing agent to the surfaces of
the gear lever and ball that are to be glued.
See “Technical data”. Immediately wipe the
surfaces with a clean piece of paper or a
lint-free cloth.
2. Apply glue to the gluing surface of the gear
lever and all around the ball. See “Technical
data”.
3. Position the gear lever in the ball and check
that the pipe is not pushed out. Turn the
gear lever once or twice to achieve a good
bond.
4. Place the gear lever and ball to one side in
a vertical position and leave the assembly
to harden for 10 minutes.
5. Remove excess adhesive from the ball.
6. Fit the gear lever into the bearing cover and
fit the snap ring.
7. Secure the gaiter by means of the lips.
These must be pulled through the slots in
the locking plate.
8. Connect the air pipes. Ensure that the pipes
are clear of any moving parts.
9. Check that the pneumatic system is airtight.
10. Check that all switches, both mechanical
and pneumatic, function properly.
22
ᓻ 0111
https://www.truck-manuals.net/