EasyManua.ls Logo

DAF CF75 Series - Page 445

DAF CF75 Series
504 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
CF65/75/85 series Removal and installation
PTO
4-3
5. Fit the engine bracket attachment bolts.
6. Fit the entire PTO to the flywheel housing.
7. Fit the flywheel.
8. Fit the clutch release assembly.
9. Fit the gearbox.
4.3 REMOVAL AND INSTALLATION, NH/1 AND NL/1 PTO, B VERSION
Removing NH/1 and NL/1 PTO, B version
1. Drain as much gearbox oil as necessary
and collect it in a clean container.
2. Remove the electrical connector and air
pipe from the PTO.
3. Remove the drive flange, which is mounted
against the PTO flange.
4. Remove the attachment nuts connecting the
PTO to the gearbox and remove the PTO
including needle bearing and gasket.
5. If necessary, remove the intermediate shaft.
Installing NH/1 and NL/1 PTO, B version
1. If necessary, install the intermediate shaft.
2. Install the gasket over the studs.
3. Install the PTO with needle bearing onto the
gearbox.
4. Fit the attachment nuts onto the studs of the
gearbox and the PTO.
5. Connect the electrical connector and air
pipe to the PTO.
6. Install the drive flange against the
PTO flange.
7. Check the oil level in the gearbox.
13
200337
https://www.truck-manuals.net/

Other manuals for DAF CF75 Series

Related product manuals