3
MECHANICAL GEARBOX CONTROL
Removal and installation CF65/75/85 series
3-4
6. Loosen the gaiter from the locking plate by
lifting the gaiter and pulling the gaiter lips
away from the locking plate.
7. Then remove the Seeger ring that has
become visible from the bearing cover. It is
now possible to remove the entire gear
lever from the bearing cover.
8. Use a press to remove the ball from the
gear lever. Heat the ball if necessary.
9. Remove the gaiter.
W 302059
V300405
2
ᓻ 0111
https://www.truck-manuals.net/