EasyManua.ls Logo

Daikin DPS016 User Manual

Daikin DPS016
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
3–6 tons
7–15 tons
Shown with Energy Recovery
16–28 tons
Shown with Energy Recovery
Installation and Maintenance Manual IM 1125-7
Group: Applied Air Systems
Part Number: IM 1125
Date: November 2015
Rebel
Commercial Packaged
Rooftop Systems
Heating and Cooling
Models DPS003 – 028A
R-410A Refrigerant
MicroTech
®
III Unit Controller
Energy Recovery Wheel

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Daikin DPS016 and is the answer not in the manual?

Daikin DPS016 Specifications

General IconGeneral
BrandDaikin
ModelDPS016
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Hazard Identification Information

Explains DANGER, WARNING, and CAUTION symbols.

Mechanical Installation

Installer Responsibilities

Outlines the duties of the installing company and personnel.

Service Clearance

Recommendations for maintaining service access around the unit.

Ventilation Clearance

Minimum clearance recommendations for unit ventilation.

Roof Curb Assembly and Installation

Assembly Instructions

Step-by-step guide for assembling the roof curb.

Rigging and Handling

Rigging holes for shackles

Instructions on using lifting points and spreader bars.

Installing Ductwork

Installing Building Static Pressure Sensor Taps

Electrostatic Discharge (ESD)

Before Start-Up

DPS 003–015 Component Description

High Pressure Switch

VFD Compressor Operation – DPS 016–028

VFD Compressor Protection Unloading Control

Low/High Discharge Superheat

Optional Gas Heat

DPS 003–015 Sequence of Operation

Start-Up Procedures

Before Start-Up

Comprehensive pre-start check list.

Maintenance

Refrigerant Charge

Service and Warranty Procedures

Warranty Registration Form

Rebel Equipment Warranty Registration Form (continued)

III. START-UP COMPRESSOR OPERATION

Checks for compressor start-up and operation.

VIII. FURNACE CHECK, TEST, & START

Checks for gas pressure and furnace controls.

Sequence of Operation

Preparing the Unit for Start Up

Pre-Start of Unit

Pre-start procedures including electrical grounding.

Check, Test and Start Procedures

Compressor Start-Up

Preparing for and starting the compressors.

Final Control Settings

Controller Settings for Normal Operation

Setting parameters for normal unit operation.

Related product manuals