EasyManua.ls Logo

Daikin ERLA11DAW1 User Manual

Daikin ERLA11DAW1
312 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installer reference guide
Daikin Altherma 3 R F
ERLA11DAV3
ERLA14DAV3
ERLA16DAV3
ERLA11DAW1
ERLA14DAW1
ERLA16DAW1
EBVH16SU23DJ6V
https://daikintechnicaldatahub.eu

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Daikin ERLA11DAW1 and is the answer not in the manual?

Daikin ERLA11DAW1 Specifications

General IconGeneral
BrandDaikin
ModelERLA11DAW1
CategoryHeat Pump
LanguageEnglish

Summary

General Safety Precautions

Installer Safety Guidelines

General safety instructions and regulations for installers to follow during installation and service.

Refrigerant Safety Precautions

Covers critical safety measures for handling refrigerants R410A and R32, including leak prevention.

Electrical Safety Precautions

Mandatory electrical safety measures to prevent shock, fire, and equipment damage.

Specific Installer Safety Instructions

R32 Refrigerant Specific Safety

Highlights special safety requirements and precautions when working with R32 refrigerant.

Piping Installation Safety

Safety precautions for refrigerant and water piping installation, including material and connection methods.

Electrical Installation Safety

Detailed safety instructions for electrical wiring, earthing, and component connections.

Application Guidelines

Domestic Hot Water Tank Setup

Comprehensive guide to setting up the domestic hot water tank, including system layout and temperature control.

Unit Installation Procedures

Installation Site Preparation

Guidelines for selecting and preparing the installation site, ensuring adequate space and avoiding work areas.

Outdoor Unit Site Requirements

Specifies requirements for the outdoor unit's installation site, including spacing and wind protection.

Outdoor Unit Mounting Guide

Step-by-step instructions for providing the installation structure and mounting the outdoor unit.

Indoor Unit Mounting Guide

Step-by-step instructions for mounting the indoor unit, including leveling and drain hose connection.

Piping Installation

Refrigerant Piping Preparation

Covers requirements for refrigerant piping material, diameter, temper grade, and insulation.

Connecting Refrigerant Piping

Detailed instructions and precautions for connecting refrigerant piping, including flaring and brazing.

Checking Refrigerant Piping

Procedures for checking the refrigerant piping for leaks and performing vacuum drying.

Charging Refrigerant

Guidelines and safety measures for charging refrigerant, including additional and complete recharging.

Water Piping Preparation

Details water circuit requirements, including material compatibility, pressure, and flow rate.

Connecting Water Piping

Instructions for connecting water pipes for space heating, DHW, and recirculation.

Electrical Installation

Electrical Wiring Precautions

Crucial safety warnings and precautions for all electrical wiring work to prevent hazards.

Outdoor Unit Electrical Connections

Instructions for connecting power supply and interconnection cables to the outdoor unit.

Indoor Unit Electrical Connections

Comprehensive guide to connecting various components to the indoor unit's electrical terminals.

Finishing Outdoor Unit Installation

System Configuration

Configuration Overview and Access

Explains the purpose of configuration and methods to access settings via the user interface.

Configuration Wizard Guide

Details the initial system setup process using the configuration wizard for essential settings.

Main Zone Settings Configuration

Detailed settings for the main zone, including room, setpoint range, and emitter types.

Tank Settings and Operation

Configuration of domestic hot water tank settings, including powerful operation, comfort, and eco modes.

Commissioning Procedures

Commissioning Overview and Safety

Introduction to the commissioning process and essential safety precautions to follow.

Pre-Commissioning Checklist

A checklist of essential items to verify after installation and before starting commissioning.

Commissioning Checklist Steps

Detailed steps for performing commissioning, including flow rate, air purge, and test runs.

Minimum Flow Rate Verification

Procedure to check and ensure the minimum required water flow rate for proper operation.

Air Purge Function Guide

Instructions for performing manual and automatic air purging to remove air from the water circuit.

Operation Test Run Procedure

Steps for performing operation test runs to verify unit performance and temperatures.

Handover to the User

Maintenance and Service

Troubleshooting Guide

Solving Problems by Symptom

Guidance on diagnosing and resolving issues based on observed system symptoms.

Solving Problems by Error Codes

Instructions on how to interpret and resolve issues identified by error codes displayed on the unit.

Technical Data and Diagrams

Related product manuals