EasyManua.ls Logo

Daikin EWYQ032BAW User Manual

Daikin EWYQ032BAW
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION AND
OPERATION MANUAL
EWAQ016BAW
EWAQ021BAW
EWAQ025BAW
EWAQ032BAW
EWAQ040BAW
EWAQ050BAW
EWAQ064BAW
EWYQ016BAW
EWYQ021BAW
EWYQ025BAW
EWYQ032BAW
EWYQ040BAW
EWYQ050BAW
EWYQ064BAW
Packaged air-cooled water chiller
4PWEN70082-1C.book Page 1 Wednesday, September 25, 2013 7:31 AM

Table of Contents

Other manuals for Daikin EWYQ032BAW

Questions and Answers:

Daikin EWYQ032BAW Specifications

General IconGeneral
BrandDaikin
ModelEWYQ032BAW
CategoryChiller
LanguageEnglish

Summary

4. INSTALL THE CHILLER

4.2. Install the unit

Details placing the unit on its foundation and securing it properly.

4.5. Perform the water piping work

Details the procedures for connecting and preparing the water circuit for the chiller.

4.6. Connect the electrical wiring

Details the steps and considerations for connecting the unit's electrical wiring.

5. COMMISSIONING THE CHILLER

5.1. Verify completion of installation

Lists essential checks before powering up the unit, including wiring, fuses, and connections.

5.2. Configure the unit

Details how to configure the unit's settings and operations after installation.

5.2.3. Field settings on the remote controller

Explains how to access and modify field settings via the remote controller for unit customization.

5.2.4. Procedure

Details the step-by-step process for changing field settings using the remote controller interface.

5.2.5. Detailed description

Provides in-depth explanations for various field settings and their impact on unit operation.

5.3. Final check and test run

Covers final checks, performing test runs, and verifying proper operation before handover.

5.3.1. Final check

Recommends final checks before unit start-up, ensuring panels are closed and safety precautions are followed.

5.3.2. Unit test run

Outlines the procedure for performing a test run to verify unit operation and check for malfunctions.

5. OPERATING THE UNIT

5.1. Operating the remote controller

Explains how the remote controller provides full control over the chiller's functions and operation.

5.2. Name and function of buttons and icons

Identifies and describes the various buttons and icons on the remote controller interface.

5.3. Setting up the controller

Guides users on setting the clock, day of the week, and schedule timer for proper unit operation.

5.4.2. Leaving water temperature control (default)

Details how cooling is activated based on the set leaving water temperature.

5.5. Space heating operation (*) (for EWYQ units only)

Explains space heating control modes for EWYQ units, based on room or water temperature.

5.9. Programming and consulting the schedule timer

Guides on programming and reviewing scheduled operations for cooling and heating.

5.9.2. Programming

Step-by-step instructions for programming space cooling and heating schedules via the remote controller.

6. FIELD SETTINGS

7. MAINTENANCE

8. TROUBLESHOOTING

8.1. Error codes

Related product manuals