EasyManua.ls Logo

Daikin EWYQ040BAW - User Manual

Daikin EWYQ040BAW
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION AND
OPERATION MANUAL
EWAQ016BAW
EWAQ021BAW
EWAQ025BAW
EWAQ032BAW
EWAQ040BAW
EWAQ050BAW
EWAQ064BAW
EWYQ016BAW
EWYQ021BAW
EWYQ025BAW
EWYQ032BAW
EWYQ040BAW
EWYQ050BAW
EWYQ064BAW
Packaged air-cooled water chiller
4PWEN70082-1C.book Page 1 Wednesday, September 25, 2013 7:31 AM

Table of Contents

Other manuals for Daikin EWYQ040BAW

Questions and Answers

Summary

INTRODUCTION

Warnings and Symbols Explained

Explains the meaning of warnings and symbols used throughout the manual.

INSTALLATION PRECAUTIONS

General Safety Precautions

Covers electrical shock, high temperature, and animal hazards during installation.

INSTALLATION PREPARATION

Installation Location Verification

Details criteria for selecting an appropriate installation site.

Water Piping Preparation Steps

Outlines necessary steps and precautions for preparing water piping connections.

Water Flow and Piping Specifications

Details water flow, piping diameter, minimum flow, and filter recommendations.

Electrical Wiring Preparation Guidelines

Instructions and warnings for preparing electrical wiring work.

INSTALLING THE CHILLER

Unit Placement and Foundation

Steps for placing the unit on its final foundation, ensuring it is level and stable.

WATER PIPING WORK

Water Pipe Connection and Insulation

Details connecting water pipes and the importance of insulation.

Electrical Wiring Connections

Prepares and connects electrical wiring according to diagrams and regulations.

Freeze Protection for Water Circuit

Discusses heater tape and glycol use for freeze protection.

FILLING THE WATER CIRCUIT

ELECTRICAL WIRING CONNECTIONS

Field Wiring Overview and Cable Selection

Explains field wiring requirements and specifies cable selection criteria.

Remote Controller Installation Procedure

Procedures for installing the remote controller, including wiring and mounting.

COMMISSIONING THE CHILLER

Installation Completion Verification

Checklist to ensure all installation steps and checks are completed before startup.

Unit Configuration and Field Settings

Steps to configure unit settings via field settings on the outdoor module.

DETAILED DESCRIPTION OF FIELD SETTINGS

[3] Weather Dependent Set Point Configuration

Setting up automatic temperature adjustment based on outdoor conditions.

[8-04] Freeze-Up Prevention Settings

Setting levels for preventing freeze-up in the water circuit.

FINAL CHECK AND TEST RUN

Final Installation Checks

Final checks for installation, panels, and safety before unit startup.

Unit Test Run Procedure

Procedures for performing a test run to verify correct operation.

Heating;Cooling Test Operation

Steps to test heating and cooling operations and resolve errors.

HANDOVER TO THE USER

SPACE HEATING OPERATION

Weather Dependent Set Point Operation

Automatic heating temperature adjustment based on outdoor conditions.

OTHER OPERATION MODES

CONTROLLER SETUP

SPACE COOLING OPERATION

PROGRAMMING AND CONSULTING SCHEDULE TIMER

Programming Space Heating and Cooling

Step-by-step guide to programming cooling and heating schedules.

FIELD SETTINGS

Procedure for Modifying Field Settings

Step-by-step guide to entering and modifying field settings.

FIELD SETTINGS TABLE

MAINTENANCE

TROUBLESHOOTING

Common Issues and Corrective Actions

Troubleshooting guide for common problems like display issues or schedule timer errors.

ERROR CODES

Error Code Reference Guide

Lists error codes, their causes, and corrective actions.

Summary

INTRODUCTION

Warnings and Symbols Explained

Explains the meaning of warnings and symbols used throughout the manual.

INSTALLATION PRECAUTIONS

General Safety Precautions

Covers electrical shock, high temperature, and animal hazards during installation.

INSTALLATION PREPARATION

Installation Location Verification

Details criteria for selecting an appropriate installation site.

Water Piping Preparation Steps

Outlines necessary steps and precautions for preparing water piping connections.

Water Flow and Piping Specifications

Details water flow, piping diameter, minimum flow, and filter recommendations.

Electrical Wiring Preparation Guidelines

Instructions and warnings for preparing electrical wiring work.

INSTALLING THE CHILLER

Unit Placement and Foundation

Steps for placing the unit on its final foundation, ensuring it is level and stable.

WATER PIPING WORK

Water Pipe Connection and Insulation

Details connecting water pipes and the importance of insulation.

Electrical Wiring Connections

Prepares and connects electrical wiring according to diagrams and regulations.

Freeze Protection for Water Circuit

Discusses heater tape and glycol use for freeze protection.

FILLING THE WATER CIRCUIT

ELECTRICAL WIRING CONNECTIONS

Field Wiring Overview and Cable Selection

Explains field wiring requirements and specifies cable selection criteria.

Remote Controller Installation Procedure

Procedures for installing the remote controller, including wiring and mounting.

COMMISSIONING THE CHILLER

Installation Completion Verification

Checklist to ensure all installation steps and checks are completed before startup.

Unit Configuration and Field Settings

Steps to configure unit settings via field settings on the outdoor module.

DETAILED DESCRIPTION OF FIELD SETTINGS

[3] Weather Dependent Set Point Configuration

Setting up automatic temperature adjustment based on outdoor conditions.

[8-04] Freeze-Up Prevention Settings

Setting levels for preventing freeze-up in the water circuit.

FINAL CHECK AND TEST RUN

Final Installation Checks

Final checks for installation, panels, and safety before unit startup.

Unit Test Run Procedure

Procedures for performing a test run to verify correct operation.

Heating;Cooling Test Operation

Steps to test heating and cooling operations and resolve errors.

HANDOVER TO THE USER

SPACE HEATING OPERATION

Weather Dependent Set Point Operation

Automatic heating temperature adjustment based on outdoor conditions.

OTHER OPERATION MODES

CONTROLLER SETUP

SPACE COOLING OPERATION

PROGRAMMING AND CONSULTING SCHEDULE TIMER

Programming Space Heating and Cooling

Step-by-step guide to programming cooling and heating schedules.

FIELD SETTINGS

Procedure for Modifying Field Settings

Step-by-step guide to entering and modifying field settings.

FIELD SETTINGS TABLE

MAINTENANCE

TROUBLESHOOTING

Common Issues and Corrective Actions

Troubleshooting guide for common problems like display issues or schedule timer errors.

ERROR CODES

Error Code Reference Guide

Lists error codes, their causes, and corrective actions.

Daikin EWYQ040BAW Specifications

General IconGeneral
BrandDaikin
ModelEWYQ040BAW
CategoryChiller
LanguageEnglish

Related product manuals