EasyManua.ls Logo

Daikin FFQ25B7V1B - Page 281

Daikin FFQ25B7V1B
390 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESIE05-04 Disassembly and Maintenance
Part 5 – Disassembly and Maintenance 5–31
3
5
1
5
1.11.6 Removal of Switch Box
Warning Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure Points
1
Remove the 2 mounting
screws on the switch
box cover.
2
Remove the 1 mounting
screw on the terminal
block cover.
3
Disconnect each
connector
(7 connectors in total)
connected to the inside
of the switch box.
Q Transfer connector x
3 pieces
Q Direct connector x 4
pieces
Switch box cover
Terminal block box
cover
Remote controller
Moisture sensor
Heat exchanger
temperature
thermistor
Float switch
Drain pump
Swing motor
For power
supply
connection
Swing motor
Moisture sensor
Remote controller

Table of Contents

Other manuals for Daikin FFQ25B7V1B

Related product manuals