EasyManua.ls Logo

Daikin FFQ25B7V1B - Page 286

Daikin FFQ25B7V1B
390 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Disassembly and Maintenance ESIE05-04
5–36 Part 5 – Disassembly and Maintenance
3
1
5
5
1.11.8 Removal of Fan Motor
Warning Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure Points
Q Remove the terminal block
box cover according to the
procedure for removing the
switch box, then disconnect
the following connectors.
Transfer connector
z Wired remote controller
z Swing motor
z Humidity sensor
Connector built in the
switch box
z Connector used for
power supply cables
1 Removing the bell mouth.
1 Disconnect the 2 remote
controller cables and 3
power supply cables.
2 Disconnect the drain
pump and float switch
wiring from bell mouth.
(
*1)
3 Remove the 5 mounting
screws on the bell mouth.
*1: At this time, do not cut the
clamp material attached to the
drain pan near the switch box.
Loosen the mounting screw to
remove the clamp material.
For heat pump
For float switch
Remote
controller
cable
Power supply cable

Table of Contents

Other manuals for Daikin FFQ25B7V1B

Related product manuals