EasyManua.ls Logo

Daikin FFQ25B7V1B - Page 304

Daikin FFQ25B7V1B
390 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Disassembly and Maintenance ESIE05-04
5–54 Part 5 Disassembly and Maintenance
3
1
5
5
Step Procedure Points
3 Remove five pieces of
lead wires from PCB on
the switch box and lead
wire connected to the
capacitor for fan motor.
(Refer to the list shown in
the right.)
4 Cut tie wraps fixing lead
wires of float switch,
thermistor for heating and
liquid pipe thermistor.
5 Remove two fixing
screws located at both
ends of switch box and
one screw inside the box.
6 Remove the switch box.
Five pieces lead wires shown below (connect to the PCB) and
lead wire connected to the capacitor for fan motor.
X15A······Lead wire of float switch
X17A······Lead wire of thermistor for heating
X18A······Lead wire of liquid pipe thermistor
X20A······Lead wire of fan motor
X25A······Lead wire of drain pump
(S2763)

Table of Contents

Other manuals for Daikin FFQ25B7V1B

Related product manuals