EasyManua.ls Logo

Daikin FFQ25B7V1B - Page 371

Daikin FFQ25B7V1B
390 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESIE05-04 Disassembly and Maintenance
Part 5 – Disassembly and Maintenance 5–121
3
5
1
5
1.15.8 Drain Hose Piping to the Left
Warning Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step Procedure Points
Q Removing the front grille in
accordance with "Removal
of Front Grille".
Q The drain pan and bottom
frame are designed as an
integral-type.
Q Insert the drain hose to the
hose plug securely as far as it
will go.
1 Pull out the drain hose
attached on the rear right
of the unit.
2 Pull out the drain plug
and drain socket
attached on the rear left
of the unit.
3 Piping of Drain Hose at
Left Side.
4 Insert the drain plug and
drain socket into the right
side of the unit with
hexagonal pin wrench.
Q Insert the drain plug and
socket securely as far as it will
go.

Table of Contents

Other manuals for Daikin FFQ25B7V1B

Related product manuals