EasyManua.ls Logo

Daikin FFQ25B9V1B - Page 421

Daikin FFQ25B9V1B
462 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SiBE121135 Trial Operation
Trial Operation and Field Settings 409
ARC452 Series
(1) Press the [ON/OFF] button to turn on the system.
(2) Press the both of [TEMP] buttons and the [MODE] button at the same time.
(3) Press the [MODE] button twice.
(T appears on the display to indicate that trial operation is selected.)
(4) Press the [MODE] button and select the operation mode.
(5) Trial operation terminates in approx. 30 minutes and switches into normal mode. To quit a
trial operation, press the [ON/OFF] button.
ARC433 Series
(1) Press the [ON/OFF] button to turn on the system.
(2) Press the center of the [TEMP] button and the [MODE] button at the same time.
(3) Press the [MODE] button twice.
(T appears on the display to indicate that trial operation is selected.)
(4) Press the [MODE] button and select the operation mode.
(5) Trial operation terminates in approx. 30 minutes and switches into normal mode. To quit a
trial operation, press the [ON/OFF] button.
(R14594)
(2)
(2) (3) (4)
(1) (5)
(2)
(3)
(2)
(1) (5)
(3)
(2) (3) (4)
(R9663)

Table of Contents

Other manuals for Daikin FFQ25B9V1B

Related product manuals