EasyManua.ls Logo

Daikin FFQ25BV1B - Page 318

Daikin FFQ25BV1B
390 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Disassembly and Maintenance ESIE05-04
5–68 Part 5 Disassembly and Maintenance
3
1
5
5
3 Install the heat
exchanger mounting
plate.
4
Insert two thermistors.
Then cover the header by
anti sweat tube.
Q Set the lead wire with yellow
tape (for heating) upper side
while that with no tape (for
liquid) lower side.
5 Reinstall the lead wire of
thermistor and anti sweat
tube on the original
position by using two
pieces of heat resistance
tie wrap.
Heat resistance tie wrap
Parts No.:1278921
(Drg No.:4SA90202-1)
Step Procedure Points
Heat exchanger
mounting plate
(S2681)
(S2682)
Anti sweat tube
(S2673)
Anti sweat tube

Table of Contents

Other manuals for Daikin FFQ25BV1B

Related product manuals