EasyManua.ls Logo

Daikin FFQ25BV1B - Page 380

Daikin FFQ25BV1B
390 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Disassembly and Maintenance ESIE05-04
5–130 Part 5 – Disassembly and Maintenance
3
1
5
5
1.16.7 Removal of Drain Pan
Warning Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure Points
Q If removing the drain pan:
Carry out pump down,
disconnect the transmission
piping and wiring, and
remove the main unit.
The bottom panel is fastened to
the unit installation plate by 3
screws.
Q Remove side panels,
operation display cover and
front cover according to
their removal procedures.
1 Remove the bottom
panel.
2 Remove the air discharge
section.

Table of Contents

Other manuals for Daikin FFQ25BV1B

Related product manuals