EasyManua.ls Logo

Daikin FTXA20A - Page 49

Daikin FTXA20A
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 | Components
Service manual
49
FTXA20~50A(W)(S)(T) + FTXA20~50B(B)(S)(T) + RXA42+50A +
RXA20~35A(9) + RXA42+50B
Split Stylish R32
ESIE18-03D – 2021.05
V U
W
U Wire terminal U
V Wire terminal V
W Wire terminal W
CAUTION
Before measuring the compressor motor windings resistance, measure the
resistance of the multimeter probes by holding the probes against each other. If the
measured resistance is NOT 0Ώ, this value MUST be substracted from the measured
winding resistance.
4 Measure the resistance between the compressor motor windings U-V, V-W
and U-W.
Result: All measurements MUST be approximately the same.
Compressor motor winding
measurements are correct?
Action
Yes Continue with the next step.
No Replace the compressor, see
"2.2.2Repair procedures"[452].
5 Measure the continuity of the U, V and W wires between the compressor and
the PCB. If no continuity, correct as needed, see "5.2Wiring diagram"[4171].
6 Connect the Faston connectors to the compressor wire terminals U, V and W

Table of Contents

Related product manuals