EasyManua.ls Logo

Daikin FTXF60A2V1B - Before Operation

Daikin FTXF60A2V1B
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 | Before operation
User reference guide
15
FTXF50~71D2V1B + FTXF50~71A2V1B
Daikin room air conditioner
4P513685-9E – 2021.07
4 Before operation
4.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
Inserting the batteries in the user interface.
Fixing the user interface to the wall.
Turning on the power supply.
4.2 To insert the batteries
The batteries will last for about 1 year.
1 Remove the back cover.
2 Insert both batteries at once.
3 Put the cover back.
2
3
1
AAA.LR03
4.3 To mount the user interface holder
b ca
a User interface
b Screws (field supply)
c User interface holder
1 Choose a place where the signals reach the unit.
2 Attach the holder with screws to the wall or a similar location.
3 Hang the user interface on the user interface holder.

Table of Contents

Other manuals for Daikin FTXF60A2V1B

Related product manuals