EasyManua.ls Logo

Daikin FXVQ125MY1 User Manual

Daikin FXVQ125MY1
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION MANUAL
MODELS
Floor standing duct type
FXVQ125MY1
FXVQ200MY1
FXVQ250MY1
FXVQ400MY1
FXVQ500MY1
FXVQ500MY16
SYSTEM Air Conditioners
CAREFULLY READ THESE INSTRUCTIONS BEFORE INSTALLATION.
KEEP THIS MANUAL IN A HANDY PLACE FOR FUTURE REFERENCE.
00_CV_3P345056-4F.indd 1 9/3/2015 14:37:19
Question and Answer IconNeed help?

Do you have a question about the Daikin FXVQ125MY1 and is the answer not in the manual?

Daikin FXVQ125MY1 Specifications

General IconGeneral
BrandDaikin
ModelFXVQ125MY1
CategoryAir Conditioner
LanguageEnglish

Summary

1. SAFETY PRECAUTIONS

2. BEFORE INSTALLATION

2-3 Post-Installation Work Check

Checklist for critical tasks and items to verify after completing installation work.

4. INSTALLATION SITE

5. CAUTION AT INSTALLATION

6. REFRIGERANT PIPING

6-2 Working Refrigerant Piping

Instructions on handling and working with refrigerant piping, including brazing.

6-3 PIPING CONNECTION

Precautions and methods for brazing refrigerant piping joints, including nitrogen blow.

6-4 CONNECTION PIPING PROCESSING

Methods for processing connection piping for left/right side connections, including bush modification.

7. DRAIN PIPING

7-1 INSTALL DRAIN PIPING

Instructions for installing drain piping, ensuring proper drainage and insulation to prevent condensation.

8. ELECTRIC WIRING

Earth Leakage Circuit Breaker Installation

Requirement to install an earth leakage circuit breaker to prevent electric shocks and fires.

Indoor/Outdoor & Power Supply Wiring

Wiring Separation & Noise Prevention

8-4 PRECAUTIONS WHEN LAYING POWER WIRING

Control Box Lid Securing Warning

8-5 DETAILS OF STANDARD DEVICES

2. Specification for field supplied fuses and wiring

9. FIELD SETTING AND CONTROL WIRING

9-1 FIELD SETTING

Procedure for field setting various modes and options, including filter sign and power failure reset.

9-2 REMOTE CONTROLLER AND CENTRALIZED CONTROL

10.TRIAL OPERATION

Troubleshooting Trial Operation

Troubleshooting common issues during trial operation based on control panel display codes.

Related product manuals