EasyManua.ls Logo

Daikin Perfera ATXM35R - High Pressure Switch

Daikin Perfera ATXM35R
256 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 | Components
Service manual
85
RXM20~71R + ARXM25~71R + FTXM20~71R + ATXM25~50R +
FVXM25~50A
Split New Perfera R32
ESIE20-11 – 2021.01
b
a
c
a Expansion valve motor
b Pipe retention clip
c Pipe
2 Route the expansion valve motor harness towards the appropriate PCB.
3 Connect the expansion valve motor connector to the appropriate PCB.
WARNING
When reconnecting a connector to the PCB, make sure to connect it on the correct
location and do NOT apply force, as this may damage the connector or connector
pins of the PCB.
4 Fix the expansion valve motor harness using new tie straps.
5 Install the insulation cap on the expansion valve motor (if applicable).
Is the problem solved? Action
Yes No further actions required.
No Return to "Checking procedures"[475]
of the expansion valve and continue
with the next procedure.
3.6 High pressure switch
3.6.1 Checking procedures
To perform an electrical check of the high pressure switch
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
Prerequisite: Remove the required plate work, see "3.14Plate work"[4151].
1 Recuperate the refrigerant from the refrigerant circuit, see "Repair
procedures"[4209].
2 Fill the refrigerant circuit with nitrogen until pressurized just below operating
pressure of the high pressure switch.

Table of Contents

Related product manuals