EasyManua.ls Logo

Daikin Perfera RXM71R - Page 167

Daikin Perfera RXM71R
256 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 | Components
Service manual
167
RXM20~71R + ARXM25~71R + FTXM20~71R + ATXM25~50R +
FVXM25~50A
Split New Perfera R32
ESIE20-11 – 2021.01
2 Remove the main PCB, see "Repair procedures" [4 131]. The reactor
measuring points are ONLY reachable on the back side of the main PCB.
3 Measure the resistance of the reactor using a low ohm multi meter.
Result: The resistance MUST be as follows:
Measuring points Resistance
c 24~36mΩ
d 68~102mΩ
c
c
c
c
a bd d
dd
a L803
b L804
c Measuring point
d Measuring point
Is the resistance measurement correct? Action
Yes Proceed with the next step.
No Replace the reactor, see "Repair
procedures"[4169].
4 Measure the inductance of the reactor using an LCR meter.
Result: The inductance MUST be 80~100µH.
b
d
d
b
a c
a L803
b L803 measuring point
c L804
d L804 measuring point
Is the inductance measurement
correct?
Action
Yes Return to the troubleshooting of the
specific error and continue with the
next step.

Table of Contents

Related product manuals