Test Operation SiBE37-701_B
173 Test Operation
z
If the check operation was not performed at first installation, the malfunction code “U3” will
be displayed in the remote controller. Perform the check operation following “ 1.2.5.2.2
Procedure of check operation”.
3. Checks After Test Run
Perform the following checks after the test run is complete.
z
Record the contents of field setting.
→
Record them on the accessory “REQUEST FOR THE INDICATION” label.
And attach the label on the back side of the front panel.
z
Record the installation date.
→
Record the installation date on the accessory “REQUEST FOR THE INDICATION” label
in accordance with the IEC60335-2-40.
And attach the label on the back side of the front panel.
Note: After the test run, when handing the unit over to the customer, make sure the EL.COMPO.BOX
lid, the inspection door, and the unit casing are all attached.