Do you have a question about the Daikin RXMQ6PVE and is the answer not in the manual?
Steps for removing the top and front panels, including details on screws and hooks.
Steps for preliminary preparation, including removing panels and releasing hooks for the terminal block mounting plate.
Preliminary steps involve removing discharge grill and panels, then removing nuts fixing the propeller fan.
Detailed steps for removing various thermistors (discharge, suction, liquid pipe, heat exchanger) after panel removal.
Procedure for pulling out the electronic expansion valve coils and removing pressure sensors.
Steps to remove the coil of the four-way valve, including safety precautions and disconnection of brazing parts.
Steps to pull off compressor lead wires and open sound insulation for the terminal cover.