EasyManua.ls Logo

Daikin RXP25N5V1B9 User Manual

Daikin RXP25N5V1B9
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation manual
R32 split series
English
Installation manual
R32 split series
RXP20N5V1B9
RXP25N5V1B9
RXP35N5V1B9
ARXP20N5V1B9
ARXP25N5V1B9
ARXP35N5V1B9

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Daikin RXP25N5V1B9 and is the answer not in the manual?

Daikin RXP25N5V1B9 Specifications

General IconGeneral
ModelRXP25N5V1B9
Cooling Capacity2.5 kW
Heating Capacity3.2 kW
Energy Efficiency RatingA++
RefrigerantR32
SEER6.1
Energy Efficiency Class (Cooling)A++
Energy Efficiency Ratio (Heating)4.0
TypeSplit System
Sound Power Level (Cooling)49 dB(A)
Sound Pressure Level (Cooling)19 dBA
Power Supply220-240V / 50Hz
Noise Level (Indoor Unit)19 dBA

Summary

About the documentation

About this document

Details the scope and purpose of this installation manual.

Specific installer safety instructions

Unit installation safety

Safety instructions for installing the unit.

About the box

Outdoor unit description

Details regarding the outdoor unit.

Unpacking the outdoor unit

Instructions for unpacking the outdoor unit.

Unit installation

Preparing the installation site

Guidelines for preparing the installation location for the outdoor unit.

Installation site requirements

Specifies spacing requirements for outdoor unit installation.

Cold climate installation requirements

Special considerations for installing the unit in cold weather conditions.

Removing outdoor unit accessories

Procedure for removing accessories from the outdoor unit.

Mounting the outdoor unit

Steps for mounting the outdoor unit.

Installation structure provision

Instructions for preparing the mounting structure for the outdoor unit.

Installing the outdoor unit

Steps for physically installing the outdoor unit.

Providing drainage

Ensuring proper drainage for the outdoor unit.

Preventing outdoor unit from falling

Measures to secure the outdoor unit against tilting.

Piping installation

Preparing refrigerant piping

Requirements for preparing refrigerant piping.

Refrigerant piping specifications

Details on material, diameter, and thickness for refrigerant pipes.

Refrigerant piping length and height

Maximum allowable lengths and height differences for refrigerant pipes.

Refrigerant piping insulation

Specifications for insulating refrigerant piping.

Connecting refrigerant piping

Procedure for connecting refrigerant piping.

Connecting refrigerant piping precautions

Safety warnings and precautions for connecting refrigerant piping.

Connecting piping to outdoor unit

Specific steps to connect piping to the outdoor unit.

Checking refrigerant piping

How to check the refrigerant piping.

Checking for leaks

Procedure for checking refrigerant piping for leaks.

Vacuum drying

Instructions for performing vacuum drying on the system.

Charging refrigerant

About charging refrigerant

Information on when additional or complete refrigerant charging is needed.

Determining additional refrigerant amount

How to calculate the required additional refrigerant based on piping length.

Determining complete recharge amount

Determining the total refrigerant needed for a complete recharge.

Charging additional refrigerant

Steps for charging additional refrigerant into the system.

Fixing the fluorinated greenhouse gases label

Instructions for applying the refrigerant label.

Electrical installation

Standard wiring component specifications

Details on required wiring components and specifications.

Connecting electrical wiring to outdoor unit

Step-by-step guide for connecting electrical wiring to the unit.

Finishing the outdoor unit installation

Finishing outdoor unit installation

Final steps to complete the outdoor unit installation.

Closing the outdoor unit

Instructions for closing the outdoor unit cover.

Commissioning

Checklist before commissioning

Items to check before starting the commissioning process.

Checklist during commissioning

Items to check while performing the commissioning.

Performing a test run

Procedure for conducting a test run of the unit.

Starting up the outdoor unit

Instructions for starting up the outdoor unit.

Troubleshooting

Fault diagnosis using outdoor unit PCB LED

Diagnosing faults using the LED indicators on the outdoor unit PCB.

Disposal

Technical data

Wiring diagram

Provides technical data and wiring diagrams for the unit.

Unified wiring diagram legend

Legend explaining the symbols used in the wiring diagrams.

Piping diagram

Diagrams illustrating the piping configurations for the unit.

Outdoor unit piping diagram

Detailed piping diagram for the outdoor unit.

Related product manuals