EasyManua.ls Logo

Daikin RXQ10AYM User Manual

Daikin RXQ10AYM
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
HQWUHRIUDYLW
540540540540
8QLWPP
(17(52)
)2817,21
%2/7+2/(6/27
(17(52)
)2817,21
%2/7+2/(6/27





(17(52)
)2817,21
%2/7+2/(
(17(52)
)2817,21
%2/7+2/(
(17(52)
)2817,21
%2/7+2/(

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Daikin RXQ10AYM and is the answer not in the manual?

Daikin RXQ10AYM Specifications

General IconGeneral
BrandDaikin
ModelRXQ10AYM
CategoryInverter
LanguageEnglish

Summary

2. General safety precautions

2.1. Safety precautions

Covers critical safety measures for electrical shock, piping, and handling.

2.2. Special notice of product

Highlights specific warnings and precautions related to the product itself.

6. Selecting an installation location

6.1. General precautions on installation

Covers site selection requirements for proper unit installation and stability.

7. Dimensions and service space

8. Inspecting and handling the unit

8.2. Handling

Guidance on safely lifting and transporting the unit to prevent damage.

8.3. Installing the unit

Procedures for correctly leveling and securing the unit on its foundation.

9.4. System piping (length) limitations

9.4.1 Piping length restrictions

Defines maximum allowable pipe lengths, level differences, and branching rules.

10. Precautions on refrigerant piping

10.2 Connecting the refrigerant piping

10.2.3 Connecting refrigerant piping to the outdoor unit

10.2.4 Branching the refrigerant piping

10.3. Guidelines for handling stop valve

10.4 Leak test and vacuum drying

10.4.5 Leak test

Detailed procedures for performing vacuum and pressure leak tests.

10.4.6 Vacuum drying

Step-by-step process for removing moisture from the system.

11. Pipe insulation

12. Electrical wiring work

12.1. Precautions on electrical wiring work

Critical safety warnings and compliance requirements for electrical work.

12.4. Requirements

12.5. Routing

12.6 Connection

12.6.1 Connection of transmission wiring to the system

Details on connecting transmission wiring for single and multi outdoor unit systems.

12.6.2 Connection of wiring to terminals

Instructions for connecting power supply and transmission wiring to terminals.

13. Making field settings

13.2. Operating the push buttons and DIP switches on the logic board

Guidance on using buttons and DIP switches for system configuration.

14. Charging refrigerant

14.1. Precautions

Essential safety precautions to follow during refrigerant charging.

14.2. Calculating the additional refrigerant charge

Formulas and tables for calculating the correct amount of refrigerant.

14.3. Method for adding refrigerant

Step-by-step guide for adding refrigerant, including auto-charge.

14.3.1 Flow chart

A flowchart illustrating the refrigerant charging procedure.

15. Monitoring function and field settings

15.2 Mode 2

Details on using Mode 2 for changing field settings and system configuration.

16. Test run

16.1. Test operation

Step-by-step instructions for performing the system test run.

16.1.1 Precautions before starting test operation

Safety measures and preparation steps before initiating the test run.

16.1.2 Test operation

Detailed sequence of operations during the automatic system test run.

16.1.3 Correcting after abnormal completion of the test operation

Steps to troubleshoot and resolve issues identified during the test run.

16.2 Malfunction code list

Explains how to interpret and resolve malfunction codes displayed by the unit.

18. Caution for refrigerant leaks

Related product manuals