EasyManua.ls Logo

Daikin RXQ34AMYM User Manual

Daikin RXQ34AMYM
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
HQWUHRIUDYLW
540540540540
8QLWPP
(17(52)
)2817,21
%2/7+2/(6/27
(17(52)
)2817,21
%2/7+2/(6/27





(17(52)
)2817,21
%2/7+2/(
(17(52)
)2817,21
%2/7+2/(
(17(52)
)2817,21
%2/7+2/(

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Daikin RXQ34AMYM and is the answer not in the manual?

Daikin RXQ34AMYM Specifications

General IconGeneral
BrandDaikin
ModelRXQ34AMYM
CategoryInverter
LanguageEnglish

Summary

2. General Safety Precautions

2.1 Safety Precautions

Provides crucial safety advice to prevent injury, electric shock, fire, and equipment damage during installation.

6. Selecting an Installation Location

7. Dimensions and Service Space

9. Refrigerant Pipe Size and Allowable Pipe Length

9.2 Selection of Piping Size

Provides tables and guidelines for selecting appropriate pipe sizes based on various connection types and capacities.

9.4 System Piping (Length) Limitations

9.5 Multi System Piping Installation

10. Precautions on Refrigerant Piping

10.1 Caution for Brazing

Details essential precautions for brazing refrigerant pipes, including using nitrogen and avoiding flux.

10.2 Connecting the Refrigerant Piping

Explains how to connect refrigerant piping, including deciding connection type, removing pipes, and connecting to the unit.

10.4 Leak Test and Vacuum Drying

10.4.2 Installation of Refrigerant Piping, Leak Test, Vacuuming Before Electrical Installation is Done (Regular Installation Method)

Describes the standard method for leak testing and vacuum drying before connecting electrical power.

10.4.3 Installation of Refrigerant Piping, Leak Test, Vacuuming After Electrical Installation is Done on Any Indoor or Outdoor Unit

Explains an alternative method for leak testing and vacuum drying after electrical installation, requiring specific settings.

11. Pipe Insulation

12. Electrical Wiring Work

12.1 Precautions on Electrical Wiring Work

Stresses the importance of qualified electricians and compliance with regulations for electrical installations.

12.4 Requirements

13. Making Field Settings

13.2 Operating the Push Buttons and DIP Switches on the Logic Board

Explains how to use push buttons and DIP switches to configure unit settings and monitor status.

14. Charging Refrigerant

14.1 Precautions

Lists critical precautions for charging refrigerant, including timing, type, quantity, and safety measures.

14.2 Calculating the Additional Refrigerant Charge

Provides formulas and tables for calculating the required amount of additional refrigerant based on system factors.

14.3 Method for Adding Refrigerant

Details the process for adding refrigerant, including automatic and manual methods via flow chart and steps.

15. Monitoring Function and Field Settings

16. Test Run

16.1 Test Operation

Describes the procedure for conducting the complete system test operation to verify wiring, valves, and piping length.

16.2 Malfunction Code List

Provides a list of malfunction codes, their meanings, and suggested solutions for troubleshooting.

18. Caution for Refrigerant Leaks

18.1 Introduction

Emphasizes safety measures for refrigerant leaks according to local regulations and system characteristics.

4. Appendix

1. Caution for Refrigerant Leaks

Emphasizes safety measures for refrigerant leaks according to local regulations and system characteristics.

1.1 Introduction

Highlights safety measures for refrigerant leaks according to local regulations and system characteristics.