EasyManua.ls Logo

Daikin RZQ100D9V1B - User Manual

Daikin RZQ100D9V1B
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION MANUAL
RZQ71D3V1B
RZQ100D9V1B
RZQ125D9V1B
RZQ140D9V1B
RZQ100B9W1B
RZQ125B9W1B
RZQ140B9W1B
Split System air conditioners
Question and Answer IconNeed help?

Do you have a question about the Daikin RZQ100D9V1B and is the answer not in the manual?

Summary

Safety Considerations

Before Installation

Precautions for R410 A

Strict cautions for keeping the refrigerant system clean, dry, and tight.

Precautions on Installation

Precautions on Refrigerant Piping

Refrigerant Piping

Precautions when connecting field piping and regarding insulation

Advice on connecting field piping, insulation, and preventing condensation.

Cautions for flare connection

Details on processing flares and tightening torques for safe refrigerant connections.

Evacuating

Procedure for leak test

Steps for performing leak tests on the refrigerant piping system.

Charging Refrigerant

Precaution for pumping-down operation

Pump down operation

Detailed procedure for performing the pump-down operation on different unit types.

Failure Diagnosis at the Moment of First Installation

Electrical Wiring Work

Precautions on Wiring of Power Supply and Inter-Unit Wiring

Test Operation

Procedure and safety notes for performing test operations on the installed unit.

Summary

Safety Considerations

Before Installation

Precautions for R410 A

Strict cautions for keeping the refrigerant system clean, dry, and tight.

Precautions on Installation

Precautions on Refrigerant Piping

Refrigerant Piping

Precautions when connecting field piping and regarding insulation

Advice on connecting field piping, insulation, and preventing condensation.

Cautions for flare connection

Details on processing flares and tightening torques for safe refrigerant connections.

Evacuating

Procedure for leak test

Steps for performing leak tests on the refrigerant piping system.

Charging Refrigerant

Precaution for pumping-down operation

Pump down operation

Detailed procedure for performing the pump-down operation on different unit types.

Failure Diagnosis at the Moment of First Installation

Electrical Wiring Work

Precautions on Wiring of Power Supply and Inter-Unit Wiring

Test Operation

Procedure and safety notes for performing test operations on the installed unit.

Daikin RZQ100D9V1B Specifications

General IconGeneral
TypeSplit air conditioner
Cooling Capacity10 kW
Heating Capacity11.2 kW
Power Supply3 Phase, 400V, 50Hz
RefrigerantR-32
Indoor Unit Dimensions (HxWxD)300mm x 1050mm x 210mm
Outdoor Unit Dimensions (HxWxD)740mm x 900mm x 330mm
Weight (Indoor Unit)14 kg
Outdoor Unit Noise Level49 dBA
Outdoor Unit Weight68 kg

Related product manuals