General IconGeneral
Cooling Capacity12.5 kW
Heating Capacity14.0 kW
Capacity (Cooling)12.5 kW
Capacity (Heating)14.0 kW
RefrigerantR410A
Refrigerant TypeR410A
ModelFXFSQ125ARV16

Summary

Safety Precautions and Special Notices

Safety Precautions

General safety warnings and precautions for handling and installing the air conditioner.

Special Notice: R410A Refrigerant

Critical information regarding R410A refrigerant handling and system requirements.

Disposal Requirements

Guidelines for the proper disposal of the air conditioning unit and its components.

Installation Preparation and Site Selection

Before Installation Checks

Initial checks and procedures to perform before starting the installation process.

Installation Accessories

Identification and verification of included installation accessories and optional items.

Installer Notes and Site Selection

Important advice for installers and criteria for selecting the optimal installation location.

Installation Site Considerations

Factors like ceiling height, air discharge, hanging bolts, and sensor placement.

Preparation Before Installation

Specific tasks and checks to complete before commencing the main installation work.

Unit Installation Procedures

Indoor Unit Mounting

Steps for installing the indoor unit, including ceiling opening and hanging bolt attachment.

Indoor Unit Leveling and Securing

Ensuring the indoor unit is properly leveled and secured for stable operation.

Refrigerant Piping Work

Guidelines for connecting and insulating refrigerant piping, including R410A specific requirements.

Drain Piping Work

Procedures for installing drain piping, ensuring proper drainage and preventing water leakage.

Electric Wiring Work

Comprehensive instructions for electrical wiring connections, safety, and specifications.

Final Setup and Operation

Mounting the Decoration Panel

Instructions for attaching the decorative panel to the indoor unit.

Field Setting and Test Operation

Configuring unit settings and performing functional tests after installation.

Setting Parameters and Test Operation

Detailed steps for setting various parameters and conducting operational tests.

Post-Installation Checks and Delivery

Final verification of installation, cleaning, and customer handover procedures.