OPERATION
METHODS
1.
Insert
the soft shaft
through
the 2.
Select
on oppropriote
drill
ond se-
mochine
shaft.
curely
connect
itto the
soft
shaft.
3,
Put
the
machine
to a
suitable
position! do not touch waste wo-
ter) with
the
drill
and
the
flexible
shaft inserting info the pipeline
as
much as possible.
I
.|~
t*-
Keep
one segment (200 - 300mmI
of
the
soft
shaft
between
the
ma
chine and the pipeline opening.
Press
the
control
knob
and
hold
the
rotating
soft shaft and push it into
the
pipeline.
Repeat the above ac
tions
until
the
pipeline
is through.
4.
Let
the soft shaft be 2 - 4 m out of 5. Insertthe plug intoa well ground- 6.
Turn
on the
control
knob and let
the machine
tall.
Remove
the rest ed 3 - hole single phase
socket.
the machine shaft rotate
clockwise,
of
the
shaft
and
cover
it with a
protection sleeve for future use.
8.
After
shutting down the machine
pull
9.
After
using machine let it free ro-
the soft shaft out of the pipeline.
Remove the
waste
and
clean it dry.
Keep it for future use.
Caution: Avoid the soft shaft bringing
the
waste
water
into
the
machine
or
contaminate
the
focilities
indoors.
tote for
2-3
minutes. Inject the
lubrication oil into oil holes. Keep
the machines at a dry place for
future
uses.