The tests must first be enabled and then activated.
The pump tests (brine pump and circulation pump) can be carried out
in any order.
The test cases in the table below are available in MANUAL TEST.
Additional test cases may be applicable if external applications are in-
stalled and activated.
Parameter Meaning
Compressor 0 = compressor stopped
Set compressor gear 1 –9
Brine pump 0 = stop brine pump
1 = start brine pump
Circulation pump 0 = stop circulation pump
1 = start circulation pump
Internal Immersion
heater
Three steps: 1, 2 and 3.
HGW 0 % = heat
100 % = tap water
Commissioning DHP-H Varius Pro+/DHP-L Varius Pro+
Danfoss Heating Solutions VIJSG202
23