EasyManua.ls Logo

Davey Regulmatic

Davey Regulmatic
48 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation of the probe
The probe has to be installed in vertical position, the electrical wire
being on top. Refer to drawing.
Yès
NO
A 15 mm hole has to be drilled on top
of the filtration pipe.
The part N°1 has to be glued on pipe
and the part N°2 has to be glued on
part N°1.
The probe is then threaded in part
N°2.
Refer to drawing.

Related product manuals