EasyManua.ls Logo

De Nora MIOX AE8 User Manual

Default Icon
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
AE™ SERIES ON-SITE GENERATOR
AE4, AE6 and AE8
Installation, Operation, and Maintenance Manual
March 26, 2019

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the De Nora MIOX AE8 and is the answer not in the manual?

De Nora MIOX AE8 Specifications

General IconGeneral
BrandDe Nora
ModelMIOX AE8
CategoryPortable Generator
LanguageEnglish

Summary

Introduction and Overview

Regulatory Compliance

Discusses compliance with EPA, NSF, and state regulations.

Components of the System

Space Requirements

Specifies the minimum floor space needed for the generator, brine, and oxidant tanks.

Security

Details requirements for installing equipment in a protected and secured structure.

Salt and Water Quality Requirements

Outlines necessary specifications for salt and water to ensure proper system function.

AE Series OSG System Components

Lists and describes key components like the electrolytic cell and water softener.

AE Series OSG System Optional Equipment

Heater or Chiller

Explains the need for temperature control for the electrolytic cell.

Water Pressure Boost System

Describes an optional system to ensure adequate water pressure for operation.

Receiving and unpacking the AE Series OSG

Installation

Control Panel and Mounting Installation

Instructions for installing the control panel, including mounting strut and panel attachment.

Cell Installation

Guides on how to remove and install the electrolytic cell onto the mounting panel.

Electronic Connections Required for Start-Up

Details electrical connections required for system startup.

Plumbing Connections Required for Start-Up

Outlines necessary plumbing connections for system installation.

Brine Generator Installation (Optional)

Instructions for installing the optional brine generator system.

Oxidant Storage Tank Installation

Guides for the proper installation of the oxidant storage tank.

Level Switch Installation

Instructions for installing the liquid level switch in the oxidant tank.

Oxidant Tank Connections

Details connections for the oxidant tank lid, feed line, and overflow port.

System Description

Operation

Initial Settings and Start-Up Checks

Electrical Check

Verifies that the correct AC power is supplied to the unit.

Initial Salt Filling

Step-by-step guide for filling the brine generator with salt and water.

Checks Prior to Start-Up

A checklist of items to verify before initial system startup.

Water Softener Operation

Ensures the water softener functions correctly before OSG startup.

Initial Startup

Details the process of starting up the AE System controls.

Operation Controls

System Operation

Describes the normal operating sequence and display screens.

Start-up Mode

Explains the initial mode when the system powers on and performs a flush.

Running Mode

Details the status and parameters displayed during normal operation.

Standby Mode

Explains when the system enters standby and what is displayed.

Fault Conditions

List of Hard Faults

Identifies common hard faults, their causes, and displays.

External Controls

Maintenance Guide

Daily Maintenance

Outlines the checks to perform daily for system upkeep.

Weekly Maintenance

Details the inspection and checks required on a weekly basis.

Monthly Maintenance

Lists the maintenance tasks to be performed monthly.

Quarterly Maintenance

Specifies the maintenance activities for a quarterly schedule.

Annual Maintenance

Outlines the tasks for annual system maintenance.

Storage of Equipment

Provides guidance on properly storing the system when not in use.

Procedures

Brine Pump Replacement

Instructions for replacing the brine peristaltic pump.

Rupture Disk Maintenance

Explains the function and maintenance of the rupture disk.

Replacing the Rupture Disk Diaphragm

Step-by-step guide for replacing the rupture disk diaphragm.

Acid Washing Cell

Details the procedure for acid washing the electrolytic cell.

Oxidant Demand Testing

Equipment Needed

Lists the necessary equipment for performing oxidant demand tests.

Identify Starting Range

Guides on how to determine the initial test range for oxidant demand.

Setup Calculations

Explains how to calculate volumes for oxidant demand testing.

Procedure

Step-by-step instructions for conducting the oxidant demand test.

Oxidant Demand Determination

How to interpret test results to determine water's oxidant demand.

Chlorine Production Testing

Measuring Flow

Details how to measure the volumetric flow rate of the system.

Calculating Total Chlorine Production

Provides formulas to calculate total daily chlorine production.

APPENDICES

Appendix A - Water Quality Guidelines

Lists acceptable limits for various water quality parameters.

Appendix B – Salt Quality Guidelines

Specifies purity requirements for salt used in the system.

Appendix C – AE System Wiring Schematic

Provides the electrical wiring diagram for the AE Series system.

Appendix D – MIOX System Log Sheet

Presents a template for logging system operational data.

Appendix E – Brine Peristaltic Pump Maintenance Guide

Offers guidance for the maintenance of the brine peristaltic pump.

Related product manuals