EasyManuals Logo

Dea GHOST 200 Series User Manual

Dea GHOST 200 Series
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
GHOST 200
Operating instructions and warnings
9
WARNING Theuseoftheproductunderunusualconditions
notforeseenbythemanufacturercancreatesituationsofdan-
ger,andforthisreasonalltheconditionsprescribedinthese
instructionsmustberespected.
A1
WARNING Under no circumstances must the product be
usedinexplosiveatmospheresorsurroundingsthatmayprove
corrosiveanddamagepartsoftheproduct.
A2
4.5 Instructions for risk-free operation
4.5.1 Transport
TheGHOST200gateoperatorisalwaysdeliveredpacked
inboxesthatguaranteetheproductadequateprotection.Care-
fullyreadanywarningsorinstructionsforstorageandhandling
providedonthebox.
4.5.2 Installation,assemblyanddisassembly
Thefollowingoperationsareessentialtothecorrectlaying
oftheproduct:
• thecarefuldefinitionoftheentireautomaticopeninglayout
(see also “6 Complete Closing Assembly”); in particular,
aftercarefullyassessingthecharacteristicsoftheplaceyou
haveselected,definethemodelandthecorrectpositioning
ofthefoundationbox.(seeF2,F3,F4Page30e31);
• digaholeandpositionthefoundationbox(seeF4,page30);
• checkcarefullythecorrectpositioningofthefoundationbox;
• putthefoundationboxinconcrete;
• positionthegateandweldtheleverunittothegate;
• coverwiththefoundationboxprotectivelid.
WARNING Allinstallation,maintenance,cleaningorrepair
operationsonanypartofthesystemmustbeperformedexclu-
sively by qualified personnel with the power supply discon-
nectedworkinginstrictcompliancewiththeelectricalstandar-
dsandregulationsinforceinthenationofinstallation.
A3
Thenecessityofinstallingreinforcementplatesmustalways
becarefullyassessed,whenevertheremainingpartofthestruc-
ture does not appear sufficiently strong, whenever the metal
plateuseddoesnotappearthickenoughorwheneverthemor-
phologyofthegateappearstolacksolidity.
Keepallweldingseamswellprotectedfromcorrosion.
Giveextraattentiontothealignmentoftheattachmentsand
theircorrectverticalpositioning.
4.5.3 Starting
Theinstallationoftheproductrequiresmasonryand/orwel-
dingandelectricalconnectionoperationsusingadequateequi-
pmentforthejobincompleterespectoftheaccident-prevention
standardsandregulationsinforceinthenationofinstallation.
Theproductmustbeelectricallyconnectedtoaspecialcon-
trolunitforgateoperators;seetheinstructionsprovidedforsuch
deviceforfurtherinformation.
4.5.4 Use
Theproductisdesignedforincorporationintheassemblyof
devicesthatcomprisethegate’sautomatism.DEASystemassu-
mesthatitwillalwaysbeusedincompliancewiththestandards
andregulationsinforce.
All GHOST 200 models have an unlocking system; the
workingofthissystemisthefollowing:Onceyouhaveunlocked
withaspecialkeythespringdevicecontainedintheleverunit,
theoperatorisreleasedand,ifnootherobstructionsarepre-
sent,thegateisfreetomovewithouthindrance.Theopposite
procedure,inotherwords,positioningthegateontheleverunit
andblockingthespringdevicewiththeappositespecialkey,re-
turnstheGHOST200operatortonormalworkingconditions.
WARNING Startingtheoperatorwiththeleverunitsetonthe
releasedpositionmayseverelyinjureyourarmsandlegs.Be
extremelycareful!Releasetheleverunitonlyifreallyneces-
sary:Ifthereisapowersupplyfailuredisconnectmanuallythe
powersupplyoftheoperatorbyusingtheappositeswitch;in
thisway,whenthepowerisbackyouwillbeabletostartthe
operatoronlyafterblockingtheleverunitagain.
A4
“TROUBLE-SHOOTING” table
MALFUNCTION CAUSES / SOLUTIONS
When the opening command
is given, the gate wing fails
to move and the operator’s
electric motor fails to start
The operator is not receiving correct power supply. Check all connections, fuses, and the
power supply cable conditions and replace or repair if necessary
When the opening command is
given, the motor starts but the
gate wing fails to move
Check that the unlocking system is closed (see F8, page 32)
Make sure that the electronic device for power adjustment is in good condition
Check if the gate pushes while closing; the motor electrical connections might be inver-
ted
The operator jerks or is noisy
during movement
If the wing of the gate does not move freely, release the piston and readjust the rotation
points
Make sure that the electronic device for electric power adjustment is in good condition
The power of the gearmotor may be insufficient for the characteristics of the gate’s wing;
check the choice of model whenever required
“LENGTH-WEIGHT”chart
1000
750
500
250
Kg
m
electric lock
slow
stop
fast
0 1 2 3 4

Other manuals for Dea GHOST 200 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dea GHOST 200 Series and is the answer not in the manual?

Dea GHOST 200 Series Specifications

General IconGeneral
BrandDea
ModelGHOST 200 Series
CategoryGate Opener
LanguageEnglish

Related product manuals