EasyManua.ls Logo

DeFelsko PosiTest AT-A - Batch Management Functions; Close and Delete Batch Operations; Setup Menu Configuration; Pull Parameters and Orientation Settings

DeFelsko PosiTest AT-A
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Glue failures typically occur when the glue is improperly mixed or
the coated surface has not been adequately prepared (pg. 4).
The PosiTest AT-A provides an interface to document the nature
of the fracture for each pull-off test (pg. 7). Fracture results are
included in test reports.
Glue failure: visible separation of the glue from itself,
the coating, or dolly (no coating visible on the dolly face).
Dolly
Glue
Cohesive fracture
(within a layer)
Adhesive fracture
(between layers)
Glue failure
(coating/glue)
SUBSTRATE
n
Memory Menu
New Batch
Open
Closes any currently opened batch and creates a new memory
batch, named using the lowest available number (example: B2).
New batches are date stamped when they are created.
The PosiTest AT-A stores 100,000 readings in up to 1,000
batches. Stored measurements can be reviewed on-screen or
accessed via computers, tablets, and smart phones.
Selects a previously created batch to open and make current.
9

Other manuals for DeFelsko PosiTest AT-A